Backup and Sync at same time

Accepted Solution Solved
Tuned Listener
Posts: 14
Country: Australia
Accepted Solution

Backup and Sync at same time

Hi, the Backup is scheduled every night at 8pm, and remote users are also syncing over night, is there a issue with Users syncing at the same time as a database is being backed up?

 

Cheers

Tracie

Project Manager

Stella Travel Services


Accepted Solutions
Solution
Accepted by topic author trogers
‎09-25-2015 03:20 AM
Platinum Elite Contributor
Posts: 14,388
Country: Australia

Re: Backup and Sync at same time

No. ACT!'s SQL engine can handle this. It doesn't need to lock the database to backup, although performance for the sync maybe be a bit slow at the time

View solution in original post


All Replies
Solution
Accepted by topic author trogers
‎09-25-2015 03:20 AM
Platinum Elite Contributor
Posts: 14,388
Country: Australia

Re: Backup and Sync at same time

No. ACT!'s SQL engine can handle this. It doesn't need to lock the database to backup, although performance for the sync maybe be a bit slow at the time
Tuned Listener
Posts: 14
Country: Australia

Re: Backup and Sync at same time

many thanks
Silver Contributor
Posts: 1,813
Country: USA

Re: Backup and Sync at same time

Just a thought. As mike said, you would probably be fine. however, if you are setting sync and backups via the scheduler. Why not just skip the 8pm timeframe. Better yet, schedule your syncs first so your backup has all of the days activities in it.

Test Drive Act! and Quickbooks over Citrix http://GoTryAct.com

Jon Klubnik| ActTrainer.com
(866)710 4228

ACT! Certified Consultant / ACT! Premier Trainer / ACT! Hosting Provider

Tuned Listener
Posts: 14
Country: Australia

Re: Backup and Sync at same time

good point thanks