Community
Showing results for 
Search instead for 
Do you mean 
Reply

Activities Help

Accepted Solution Solved
Tuned Listener
Posts: 16
Country: USA
Accepted Solution

Activities Help

Hello,

 

In ACT 10, is there a way that I can have a scheduled activity roll over to the next day if I don't clear it?  This would be very helpful for us.

 

Thanks 


Accepted Solutions
Solution
Accepted by topic author blinkme323
‎09-25-2015 03:20 AM
Copper Elite Contributor
Posts: 172
Country: USA

Re: Activities Help

In Tools / Preferences Calendar & Scheduling tab you will see a check box that you can set for each type of Activity.

 

The downside to using this is that you lose track of when you were originally supposed to do the Activity

Bob Kennedy
ACC
Kenbar Solutions CT,CA & FL

View solution in original post


All Replies
Solution
Accepted by topic author blinkme323
‎09-25-2015 03:20 AM
Copper Elite Contributor
Posts: 172
Country: USA

Re: Activities Help

In Tools / Preferences Calendar & Scheduling tab you will see a check box that you can set for each type of Activity.

 

The downside to using this is that you lose track of when you were originally supposed to do the Activity

Bob Kennedy
ACC
Kenbar Solutions CT,CA & FL